Construction Update 23 Sep 08

curved seat wall

The forms for the curved seat wall around the play structure.

skate rail detail

A close up showing the skate rail embed in the seatwall.   The square tube is designed to be “ground” on by the trucks of skateboarders.

manpower!

There are more men on site these days.

epoxied rebar

The rebar is epoxied into the rock, helping to make the rocks part of the seat wall.

Posted on September 24th 2008 by david in construction | |