footings!
The footing for the seat wall around the play structure is pored.
Note the opening on the far side for the sidewalk and ramp.
On the south side here, the rebar went a bit far. Will said he’d cut it back to allow for the ramp.
Posted on August 13th 2008 by david in construction | |



